DORMA sealing compound 2300, recommended for floor springs exposed to wet conditions. For filling the cavities between the floor spring body and the cement box to prevent moisture penetration (mandatory according to e.g. VOB regulations for wet rooms).
The contents of the two tins (the basic fluid and the accelerator) are sufficient for one floor spring.
Use compound immediately after mixing. Hardening process takes place after 20 minutes. After 24 hours the sealing compound is fully hardened.